HOME | TACKLETOUR FORUMS  | EDITOR'S CHOICE | REVIEW ARCHIVE | ABOUT US | 

Reels | Rods | Lures | SwimbaitsBFS Lines | Term. Tackle | Tools | Storage | Apparel | Enthusiast | Watercraft | Interviews | Events | Autopsy


 


 

 


Behind the Scenes


An Inside Look: The TackleTour Lab - Bring Up  (continued)

Cal mapped out a functional floor plan that provided maximum space for the main lab and photo studio and we documented our early progress over the first few weeks on facebook. Demolition of the pre-existing structures was quick but we soon realized that this was going to be quite a project, and fishing took a backseat for the better part of the late 2010 season.


Are you sure this wall has to go?

 


We soon had a big pile of used drywall and the room starting to get very dusty

 


Finally the space started opening up

 


With the structures gone we finally have some breathing room

 


Cal clears the debris

 


Time to get cracking, tile cracking that is

 


Wait, there is linoleum under the tile?

 


Removing tiles one at a time

 


Zander gets into a groove

 

Next Section: Is there anything worse than busting tile?

 

   

Google
  Web
  TackleTour

 

 

 
 





 

 



Copyright 2000-2024 TackleTour LLC All Rights Reserved.
Privacy Policy information